Time witnesses quality.
Shunyi District, Beijing
Two-Component Surface-Sprinkled Marking Line Project
2019-05-09
Coating
SW402
Process
Two-Component Surface-Sprinkled Spraying
Thickness
1.0mm
Construction Temperature
15℃
Huanshi East Road, Guangzhou
Two-Component Multi-Process Marking Line Project
2020-07-15
SW402 SP208 SP206
Spraying, Oscillation, Sling Coating, Spot Coating
29℃
Shizhong District, Leshan, Sichuan
Two-Component Sling Coating Marking Line Project
2017-12-29
SP208
Sling Coating
1.5-2.0mm
13℃
Baizhang Bridge, Shunde
Spraying Project of Vertical Reflective Markings
2021-10-16
SL002
Spraying
0.5-0.8mm
28℃
Weiboshan Tunnel, Shenzhen
2023-03-22
Yinzhou District, Ningbo City
Two-Component Sprayed Marking Line Project
2023-09-23
SW402 SW402-03
0.8mm
Copyright © 2020 Sanwin Traffic Equipment Co., Ltd.
All rights reserved. Yue ICP No. 11004500
WeChat Official Account
Official Online
道德监察热线 | 联系我们