Guangzhou Huanshi East Road two-component multi-process marking test section
 |
Construction time: July 15, 2020
Construction temperature: 29°C
Construction material: SW402 SP208 SP206
Spreading process: Sprinkle glass beads on the surface
|
Construction Notes
During the day, the temperature is high, and the curing time is significantly shortened, so pay attention to prevent curing risks.
The coating must be fully stirred before use, and the amount of curing agent put in component B must be fine-tuned based on real-time feedback.
The longitudinal reduction line uses automatic wire breaking, which greatly improves the construction efficiency, but attention needs to be paid to controlling the spraying flow, otherwise it may produce "rounded corners".
The edge line adopts a two-component oscillation marking, which has a good raising effect and obvious vibration feeling.
The whole process of thickness measurement and real-time quality inspection.