Two-Component Sprayed Marking Project in Yinzhou District, Ningbo

Two-Component Sprayed Marking Project in Yinzhou District, Ningbo

bfbe85537479bc3698017f16f97af266(1).jpg






Construction Time:September 23, 2023


Construction Temperature:29℃


Construction Materials:SW402  SW402-03


Sprinkling Process:Surface-sprinkled High-brightness Glass Beads


Construction Notes

The construction was carried out at night with moderate temperature, and the curing time was normal, about 15 minutes.

SW402-03 whitening coating was adopted for the paint, and the whiteness of the marking lines was better than that of ordinary marking lines.

The yellow paint was more bright and vivid, and the double yellow lines had a more obvious warning effect.

The paint must be fully stirred before use, and the dosage of curing agent added to Component B must be fine-tuned according to real-time feedback.

The 300-type equipment with a booster cart was used in this construction, which greatly improved the construction efficiency. However, attention should be paid to controlling the spraying flow rate.

The old screeded marking lines were covered by spraying, resulting in an uneven surface, and the glass beads on the raised parts settled relatively shallowly.

The retroreflection coefficient was tested throughout the process for real-time quality inspection.

On-site Records


20ffa05649a359caf7e0f0929823a09b.jpg


b13946672dcd837747e18c003084a775.jpg


02f29c4e41bdb41adda8163a1ef71382.jpg


d4d4f4e2bf2bdd9a4e0ed532225a4126.jpg


01717dba785c4d7d0b527b3053d8c0e3.jpg


e2f6ae287b175b3826fd80490b75dd93.jpg

Two-Component Sprayed Marking Project in Yinzhou District, Ningbo

Two-Component Sprayed Marking Project in Yinzhou District, Ningbo

bfbe85537479bc3698017f16f97af266(1).jpg






Construction Time:September 23, 2023


Construction Temperature:29℃


Construction Materials:SW402  SW402-03


Sprinkling Process:Surface-sprinkled High-brightness Glass Beads


Construction Notes

The construction was carried out at night with moderate temperature, and the curing time was normal, about 15 minutes.

SW402-03 whitening coating was adopted for the paint, and the whiteness of the marking lines was better than that of ordinary marking lines.

The yellow paint was more bright and vivid, and the double yellow lines had a more obvious warning effect.

The paint must be fully stirred before use, and the dosage of curing agent added to Component B must be fine-tuned according to real-time feedback.

The 300-type equipment with a booster cart was used in this construction, which greatly improved the construction efficiency. However, attention should be paid to controlling the spraying flow rate.

The old screeded marking lines were covered by spraying, resulting in an uneven surface, and the glass beads on the raised parts settled relatively shallowly.

The retroreflection coefficient was tested throughout the process for real-time quality inspection.

On-site Records


20ffa05649a359caf7e0f0929823a09b.jpg


b13946672dcd837747e18c003084a775.jpg


02f29c4e41bdb41adda8163a1ef71382.jpg


d4d4f4e2bf2bdd9a4e0ed532225a4126.jpg


01717dba785c4d7d0b527b3053d8c0e3.jpg


e2f6ae287b175b3826fd80490b75dd93.jpg

Copyright © 2020 Sanwin Traffic Equipment Co., Ltd. 

All rights reserved. Yue ICP No. 11004500


Official Online

WeChat Official Account

   
 
X