Construction of One-Component Sprayed Markings at Parking Lot in Beijiao, Foshan
 |
Construction Time:June 5, 2020
Construction Temperature:26℃
Construction Materials:SA002
Marking Process:High-Pressure Airless Spraying |
Construction Notes
The construction was carried out indoors, departing at 6:30 in the morning and finishing work at 5:00 in the evening.
Sanwin one-component coating was used, which is convenient and quick for construction, with a full curing time of no more than 30 minutes.
The base layer at the construction site was relatively dirty, so grinding and air blowing were well done before spraying and marking.
The laser ruler played an obvious role during the construction process with poor indoor lighting.